Home  »  References  »  Project works

      

    • Development of the reconstruction project of 500 kV substation «Bugulma» for the branch of JSC Grid Company - «Bugulma electrical networks» - 2012;
    • Development of working documentation for the title of «Pipeline system of CPC (Caspian Pipeline Consortium)». External power supply «NPS-7» for JSC FGC UES - 2012;
    • Design and survey work to replace the program SSPI transducers on the 110 kV «Kirov» and 110 kV, «Efremov» (JSC «Tulaenergo») - 2011;
    • Development of a model program and test procedures  of PCS and  SSPI for substations in the mode of high data traffic («Storm») to JSC «FGC UES» - 2011;
    • Development of a complex renovation project of the working switchyard 220 kV of «Zhigulevskaya HPP» - 2010;
    • Development of techno-working draft of PCS 220 kV «Levoberezhnaya» - 2010;
    • Development of common requirements for volumes, methods of processing, filtering, and types of representation in PCS of the substation a piece of information about normal and emergency conditions for JSC «FGC UES»  - 2009;
    • Development of the reconstruction project management system of main transformers with the creation of complex information-management in the microprocessor-based protection of  power transformers for the needs of JSC «RusHydro» - JSC «Votkinskaya HPP» - 2009;
    • Development of materials for the working draft of PCS 220 kV «Severnaya» (Lipetsk) - 2009;
    • Development of an analytical report, «design of substations with integrated digital control systems» to JSC  FGC UES  - 2008;
    • Development of the project: reconstruction of the control system switchgear 110, 220 kV branch of «HydroOGK» – JSC  «Votkinskaya HPP» - 2008;
    • Detailed design of control system and CCTV system of 500 kV, «Rostov» in the title: «500 kV Frolovskaya - Shahty – Rostovskaya» to 500 kV «Rostov» and with the extension of 500 kV «Shahty»- 2008;
    • Development of the project «Reconstruction of substation 35/10 № 40» CDP(central distribution point «Kirishi electricity of Ladoga JSC «Lenenergo» - 2007;
    • Development of technical specifications and detailed design of 500 kV switchgear PCS  JSC «Zhigulevskaya HPP» just  in terms of PCS - 2007;
    • Developing solutions to system integrators organization of RPA and EA (emergency automation) for facilities of St. Petersburg and the Leningrad Region - 2007;
    • Development of documentation to the working draft for PCS, performed as part of the work on the expansion and reconstruction of switchgear 500 kV Kashirskaya state district power station.(SDPS-4) with Installing autotransformers 500/220 kV - 2007.