Home  »  References  »  Project works

  Project works

 

  • Design and survey work on the investment project: “Modernization of the automated process control system at the 500 kV Substation Veshkayma and the 500 kV Substation Klyuchiki (2 systems)” - 2019-2020.
  • Design and survey work on the project “Automated system for technical accounting of electric power / automated control system of OAO Udmurtneft” - 2020
  • Development of the general technical regulation, design documentation, working documentation for the project: “Intelligent Laboratory of Digital Networks” 2019-2020.
  • Design and survey work on the investment project “Modernization of automated process control systems at 500 kV Krasnoarmeyskaya substation, 220 kV Chigashevo substation, 220 kV Ulyanovskaya substation for the implementation of the telecontrol function (3 systems)” - 2019-2020.
  • Design and survey work on the investment project “Modernization of automated control system at 500 kV Substation Arzamasskaya, 220 kV Substation Zarechnaya, 220 kV Substation Ruzayevka for the implementation of the telecontrol function (3 systems)” - 2019-2020.
  • Design and survey work on the investment project “Modernization of automated process control systems at 220 kV Penza-1 substation for the implementation of the telecontrol function (1 system)” - 2019-2020.
  • Design and survey work on the investment project “Modernization of automated process control systems at 220 kV Zeletsino substation for the implementation of the telecontrol function (1 system)” - 2019-2020.
  • Design and survey work on the investment project “Modernization of telemechanics systems at a 500 kV Veshkayma substation and a 500 kV Penza-2 substation regarding replacement of ICTS (TM) devices (4 devices)” - 2019-2020.
  • Design and survey work on the creation of an automation and protection system (SAZ) for the construction and reconstruction of the distribution network of OEC JSC 10-20 kV - 2019-2020.
  • Design and survey work on the reconstruction of telemechanics equipment as part of the title of the investment program: "Reconstruction of power equipment " - 2019-2020.
  • Development of design and working documentation in the part of automated process control systems under the title “Uncomplex reconstruction of 220 kV Barsovo substation. Replacement of server hardware and software for automated process control systems ”- 2018-2019.
  • Development of a technical design project for PTK SSPI and communication systems for 220 kV Pochinkovskaya-1 substation, 220 kV Pochinkovskaya-2 substation, 220 kV substation Lukoyanovskaya, substation 220 kV Pilna, substation 220 kV Ryzhkovskaya, substation 220 kV Uzlovaya, substation 220 kV KS-22. - 2018 year
  • Development of working design documentation for automated process control systems under the title "Reconstruction of 500 kV substation Rostovskaya (extension of 220 kV switchgear for TP" 
    Design and survey work on the investment project “Modernization of telemechanics systems at a 500 kV Veshkayma substation and a 500 kV Penza-2 substation regarding replacement of SSPI (TM) devices (4 devices)” - 2019-2020. 
  • Development of working documentation in the part of industrial control system within the framework of the title "Construction:" External power supply to the facilities of LLC RN-Uvatneftegaz from Substation Demyanskaya, taking into account its own generation. Substation 220/110/10 kV Lyantinskaya ”- 2017
  • Development of working documentation in the part of industrial control system within the framework of the title "Construction:" External power supply to the facilities of LLC RN-Uvatneftegaz from Substation Demyanskaya, taking into account its own generation. Substation 220/110/10 kV "Pihtovaya" – 2017
  • Development of working documentation in the part of industrial control system within the framework of the title "Construction:" External power supply to the facilities of LLC RN-Uvatneftegaz from Substation Demyanskaya, taking into account its own generation. Substation 220/110/10 kV Protozanovskaya ”- 2017
  • Development of working documentation regarding APCS 500 kV Substation Muravlenkovskaya - 2017.
  • Project development: “Creation of the top level of self-propelled guns of outdoor control system of Saratov hydroelectric power station” -2016
  • Development of working documentation in the part of industrial control system in the framework of the title: "Reconstruction and technical re-equipment of 330 kV Vladikavkaz-2 Substation" - 2015.
  • Development of working documentation regarding the modernization of the PTC APCS 330 kV Substation Ilyich, 220 kV Substation Test Prospectus for the title: "Reserve program for the automatic transfer switch for the needs of PAO FGC UES - MEN North-West" - 2015.
  • Development of working documentation for substation automation (in the part of the ice melting control system) (330 kV Makhachkala substation, 330 kV Baksan substation, Volgodonsk substation 220, T-15 substation 220, Zimovniki substation 220, 220 kV substation Shakhty, 220 kV substation 500 B-10, substation 220 kV Veshenskaya-2) - 2014
  • Design work for the the title "Construction of 500 kV OHL Pomary - Udmurtskaya" - 2013
  • Design work on the development of working documentation for additional work on the dismantling of PA panels at the main switchboard with the reorganization of control and signaling circuits as part of the reconstruction of the 110/220 kV self-propelled guns of the Votkinskaya HPP with the replacement of shields - 2013
  • Development of working and operational documentation for technical means of PTС NPT Expert block CCGT-230 TPP Sisak - 2015
  •  Development of design and working documentation for the title: “Modernization of the
  • APCS substation Shchelokov 500 kV complex for the remote control of switching devices from dispatch centers” (automated switching forms) - 2017.
  • Development of design and working documentation for the title: “Modernization of remote control, including a set of automated process control systems for substation 220 kV Centralnaya for remote control of switching devices from the dispatch center of the RDC of Tatarstan, the central control center of OJSC Network Company and the control center of the branch of OJSC Grid Company Kazan electric networks ”(automated switching forms) - 2017.
  • Development of working documentation regarding ACS TP under the title “Modernization of the APCS complex of 220 kV Centralnaya Substation for the purpose of remote control of switching devices from the dispatch center of the RDC of Tatarstan and the central control center of OJSC Grid Company - 2016;
  • Development of working documentation for the title “Modernization of the automated control system complex for substations of 500 kV Shchelokov for remote control of switching devices from dispatch centers of the ODC of the Middle Volga and RDC of Tatarstan” - 2016;
  • Development of design documentation for the creation of digital substations with the titles “Modernization of 330 kV Substation Ilyenko (Kislovodsk) with the introduction of innovative solutions” and “Modernization of 330 kV Substation Kaspiy (Kizlyar) with the introduction of innovative solutions” for the Branch of JSC FGC UES - MEN South - 2013;
  • “Modernization of the automated process control system of the substation 220 kV Centralnaya for remote control of switching devices from the dispatch center of the RDU of Tatarstan and the central control center of OJSC Grid company”
  • Development of the reconstruction project of 500 kV substation «Bugulma» for the branch of JSC Grid Company - «Bugulma electrical networks» - 2012;
  • Development of working documentation for the title of «Pipeline system of CPC (Caspian Pipeline Consortium)». External power supply «NPS-7» for JSC FGC UES - 2012;
  • Design and survey work to replace the program SSPI transducers on the 110 kV «Kirov» and 110 kV, «Efremov» (JSC «Tulaenergo») - 2011;
  • Development of a model program and test procedures  of PCS and  SSPI for substations in the mode of high data traffic («Storm») to JSC «FGC UES» - 2011;
  • Development of a complex renovation project of the working switchyard 220 kV of «Zhigulevskaya HPP» - 2010;
  • Development of techno-working draft of PCS 220 kV «Levoberezhnaya» - 2010;
  • Development of common requirements for volumes, methods of processing, filtering, and types of representation in PCS of the substation a piece of information about normal and emergency conditions for JSC «FGC UES»  - 2009;
  • Development of the reconstruction project management system of main transformers with the creation of complex information-management in the microprocessor-based protection of  power transformers for the needs of JSC «RusHydro» - JSC «Votkinskaya HPP» - 2009;
  • Development of materials for the working draft of PCS 220 kV «Severnaya» (Lipetsk) - 2009;
  • Development of an analytical report, «design of substations with integrated digital control systems» to JSC  FGC UES  - 2008;
  • Development of the project: reconstruction of the control system switchgear 110, 220 kV branch of «HydroOGK» – JSC  «Votkinskaya HPP» - 2008;
  • Detailed design of control system and CCTV system of 500 kV, «Rostov» in the title: «500 kV Frolovskaya - Shahty – Rostovskaya» to 500 kV «Rostov» and with the extension of 500 kV «Shahty»- 2008;
  • Development of the project «Reconstruction of substation 35/10 № 40» CDP(central distribution point «Kirishi electricity of Ladoga JSC «Lenenergo» - 2007;
  • Development of technical specifications and detailed design of 500 kV switchgear PCS  JSC «Zhigulevskaya HPP» just  in terms of PCS - 2007;
  • Developing solutions to system integrators organization of RPA and EA (emergency automation) for facilities of St. Petersburg and the Leningrad Region - 2007;
  • Development of documentation to the working draft for PCS, performed as part of the work on the expansion and reconstruction of switchgear 500 kV Kashirskaya state district power station.(SDPS-4) with Installing autotransformers 500/220 kV - 2007.